Cases -
9860 Date Filed: February 19, 2026
ONEENERGY DEVELOPMENT, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9859 Date Filed: February 17, 2026
BITTINGER SOLAR PARTNERS, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN GARRETT COUNTY, MARYLAND
9858 Date Filed: February 04, 2026
CARROLL PROVIDENCE SOLAR 1, LLC AND CARROLL PROVIDENCE SOLAR 2, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT TWO CO-LOCATED SOLAR PHOTOVOLTAIC GENERATING FACILITIES TOTALING 10 MW IN CARROLL COUNTY, MARYLAND
9856 Date Filed: January 30, 2026
LSE INO LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ALLEGANY COUNTY, MARYLAND
9857 Date Filed: January 30, 2026
NEXTERA ENERGY TRANSMISSION MIDATLANTIC, INC.'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 500KV TRANSMISSION LINE ASSOCIATED WITH THE MIDATLANTIC RESILIENCY LINK PROJECT IN PORTIONS OF ALLEGANY AND GARRETT COUNTIES, MARYLAND
9855 Date Filed: January 28, 2026
OPOSSUMTOWN PIKE SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND
9854 Date Filed: January 22, 2026
OLD ISLAND SOLAR LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.9 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ANNE ARUNDEL COUNTY, MARYLAND
9853 Date Filed: January 20, 2026
HALO JM LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9852 Date Filed: January 14, 2026
LSE AURORA LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9851 Date Filed: December 30, 2025
NORTH TELEGRAPH ROAD SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9847 Date Filed: December 23, 2025
CHABERTON SOLAR PETERS HOLDING LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT TWO CO-LOCATED SOLAR PHOTOVOLTAIC GENERATING FACILITIES TOTALING 10 MW IN HARFORD COUNTY, MARYLAND
9845 Date Filed: December 22, 2025
TPE MD CE166, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.99 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9846 Date Filed: December 22, 2025
SHADDING REACH ROAD, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND
9844 Date Filed: December 17, 2025
SIMPERS ROAD, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.875 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9842 Date Filed: December 15, 2025
ALLEGANY PV LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ALLEGANY COUNTY, MARYLAND
9843 Date Filed: December 15, 2025
BENSON ROAD SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CARROLL COUNTY, MARYLAND
9840 Date Filed: December 12, 2025
GREEN ROAD MD PV LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.75 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN BALTIMORE COUNTY, MARYLAND
9841 Date Filed: December 12, 2025
CHABERTON SOLAR GREENHORN LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.49 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN DORCHESTER COUNTY, MARYLAND
9838 Date Filed: December 12, 2025
TPE MD CE59, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9839 Date Filed: December 12, 2025
LSE CIRCE, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.85 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9837 Date Filed: December 02, 2025
CROOM ROAD SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE’S COUNTY, MARYLAND
9834 Date Filed: November 21, 2025
CHABERTON SOLAR HAYFORD LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN QUEEN ANNE’S COUNTY, MARYLAND
9835 Date Filed: November 21, 2025
ICFTS MD SOLAR, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.63 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CAROLINE COUNTY, MARYLAND
9831 Date Filed: November 07, 2025
RESH ROAD SOLAR 2 LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.25 MW PHOTOVOLTAIC GENERATING FACILITY IN WASHINGTON COUNTY, MARYLAND
9829 Date Filed: October 31, 2025
HARFORD CHAPEL SOLAR, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN HARFORD COUNTY, MARYLAND
9828 Date Filed: October 30, 2025
CHABERTON SOLAR LAMBS KNOLL LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CARROLL COUNTY, MARYLAND
9827 Date Filed: October 29, 2025
LSE AQUARIUS LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.988 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN QUEEN ANNE’S COUNTY, MARYLAND
9826 Date Filed: October 28, 2025
SOLTAGE MD DEVCO, LLC AND BERLIN LIVING, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT 6 CO-LOCATED SOLAR PHOTOVOLTAIC GENERATING FACILITIES TOTALING UP TO 18 MWAC IN THE TOWN OF BERLIN, MARYLAND
9825 Date Filed: October 27, 2025
WOODSIDE SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WORCESTER COUNTY, MARYLAND
9824 Date Filed: October 23, 2025
HEMLOCK LANE SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CARROLL COUNTY, MARYLAND
9823 Date Filed: October 21, 2025
MD AMERICAN KESTREL, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND
9822 Date Filed: October 16, 2025
OLD PRINCESS ANNE COMMUNITY ENERGY INITIATIVE, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.25 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN SOMERSET COUNTY, MARYLAND
9821 Date Filed: October 15, 2025
ECKARD ROAD SOLAR LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CARROLL COUNTY, MARYLAND
9819 Date Filed: October 10, 2025
SPRING HAVEN ROAD SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ALLEGANY COUNTY, MARYLAND
9818 Date Filed: October 03, 2025
THE POTOMAC EDISON COMPANY ‘S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO REBUILD THE MESSICK ROAD-RIDGELEY 138 KILOVOLT TRANSMISSION LINE IN ALLEGANY COUNTY, MARYLAND
9817 Date Filed: September 30, 2025
HERMAN HIGHWAY SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND
9816 Date Filed: September 26, 2025
HARFORD CALVARY SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN HARFORD COUNTY, MARYLAND
9815 Date Filed: September 24, 2025
CAPE HORN ROAD SOLAR, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CARROLL COUNTY, MARYLAND
9814 Date Filed: September 22, 2025
BESSIE CLEMSON ROAD SOLAR, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND
9812 Date Filed: September 10, 2025
BLOOMINGTON HILL 1, LLC AND BLOOMINGTON HILL 2, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT 2 CO-LOCATED SOLAR PHOTOVOLTAIC GENERATING FACILITIES TOTALING UP TO 9.9 MWAC IN GARRETT COUNTY, MARYLAND
9811 Date Filed: September 02, 2025
HOPEWELL RANCH SOLAR 1, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN HARFORD COUNTY, MARYLAND
9810 Date Filed: August 27, 2025
WALLER ROAD SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
9807 Date Filed: July 31, 2025
QUEPONCO ROAD SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WORCESTER COUNTY, MARYLAND
9806 Date Filed: July 29, 2025
NANTICOKE ROAD SOLAR 2, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
9805 Date Filed: July 28, 2025
SOLAR STAR ALLEGANY SOUTH LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.95 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ALLEGANY COUNTY, MARYLAND
9804 Date Filed: July 22, 2025
BLACKS MILL ROAD SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND
9803 Date Filed: July 18, 2025
THE POTOMAC EDISON COMPANY’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 230 KV LINE ON THE EXISTING CARROLL-GERMANTOWN 138 KV TRANSMISSION LINE IN CARROLL COUNTY, MARYLAND
9799 Date Filed: July 01, 2025
TPE MD KE77, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND
9797 Date Filed: June 27, 2025
BOUCHELLE ROAD SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9796 Date Filed: June 25, 2025
ONEENERGY DEVELOPMENT, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN HARFORD COUNTY, MARYLAND
9795 Date Filed: June 23, 2025
WICOMICO RAYNE SOLAR, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
9794 Date Filed: June 04, 2025
SOLAR STAR DOROTHY AVENUE, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN HARFORD COUNTY, MARYLAND
9793 Date Filed: May 19, 2025
PG VERMILLION SOLAR, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND
9792 Date Filed: May 13, 2025
HALO ROCK HALL, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND
9789 Date Filed: April 25, 2025
HALO CORDOVA LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN TALBOT COUNTY, MARYLAND
9790 Date Filed: April 25, 2025
TELEGRAPH ROAD SOLAR 1, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9786 Date Filed: April 04, 2025
HALO BETTERTON, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN THE TOWN OF BETTERTON, KENT COUNTY, MARYLAND
9785 Date Filed: March 19, 2025
HALO BERLIN LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.05 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY CECIL COUNTY, MARYLAND
9783 Date Filed: February 26, 2025
TPE MD SO19, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN SOMERSET COUNTY, MARYLAND
9784 Date Filed: February 26, 2025
TPE MD SO201, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN SOMERSET COUNTY, MARYLAND
9782 Date Filed: February 21, 2025
MARYLAND BLUE CRAB SOLAR & STORAGE, LCC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 100 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY, WITH 25 MW BATTERY ENERGY STORAGE SYSTEM, AND 69 KV TRANSMISSION LINE IN DORCESTER COUNTY, MARYLAND.
9780 Date Filed: February 12, 2025
CLYDE YOUNG ROAD SOLAR 1, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND.
9779 Date Filed: February 11, 2025
HALO NE1 LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND.
9777 Date Filed: January 29, 2025
AMISH ROAD SOLAR 1, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN GARRETT COUNTY, MARYLAND.
9776 Date Filed: January 27, 2025
HALO NE2 LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND.
9775 Date Filed: January 22, 2025
HARKINS LANE SOLAR 1, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND.
9774 Date Filed: January 16, 2025
HALO GB2 LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CAROLINE COUNTY, MARYLAND.
9773 Date Filed: December 31, 2024
PSEG RENEWABLE TRANSMISSION LLC 'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A NEW 500 KV TRANSMISSION LINE IN PORTIONS OF BALTIMORE, CARROLL, AND FREDERICK COUNTIES
9771 Date Filed: December 23, 2024
WICOMICO WILBER SOLAR 1, LLC, WICOMICO WILBER SOLAR 2, LLC, WICOMICO WILBER SOLAR PROJECT 3, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE TO CONSTRUCT 3 CO-LOCATED SOLAR PHOTOVOLTAIC GENERATING FACILITIES TOTALING 15.00 MW WICOMICO COUNTY, MARYLAND
9772 Date Filed: December 23, 2024
TPE MD WO73, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WORCESTER COUNTY, MARYLAND.
9770 Date Filed: December 20, 2024
CHABERTON SOLAR VICTORIA LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.25 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN MONTGOMERY COUNTY, MARYLAND.
9769 Date Filed: December 20, 2024
JADE MEADOW III LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 300 MW SOLAR PHOTOVOLTAIC GENERATING FACILITIES IN GARRETT AND ALLEGANY COUNTIES, MARYLAND.
9767 Date Filed: December 10, 2024
HALO WARWICK LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND.
9766 Date Filed: December 05, 2024
DELMARVA POWER & LIGHT COMPANY’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO REBUILD AN EXISTING 138 KV OVERHEAD TRANSMISSION LINE ON EXISTING RIGHT-OF-WAY FROM THE PINEY GROVE SUBSTATION IN WICOMICO COUNTY, MARYLAND TO THE MARYLAND/VIRGINIA STATE LINE
9765 Date Filed: December 03, 2024
HALO COLORA LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND
9764 Date Filed: November 21, 2024
RUTHSBURG RD SOLAR 1, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW COMMUNITY SOLAR ENERGY GENERATING FACILITY IN QUEEN ANNE’S COUNTY, MARYLAND
9763 Date Filed: November 06, 2024
ELK DEVELOPMENT, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.5 MW SOLAR PHOTOVOLTAIC FACILITY IN CARROLL COUNTY, MARYLAND
9759 Date Filed: October 17, 2024
CHABERTON SOLAR PAHAR LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MW SOLAR PHOTOVOLTAIC FACILITY IN CAROLINE COUNTY, MARYLAND
9755 Date Filed: September 25, 2024
TPE MD PR53, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT 4 CO-LOCATED SOLAR PHOTOVOTAIC GENERATING FACILITIES TOTALING 15 MWAC IN PRINCE GEORGE'S COUNTY, MARYLAND
9753 Date Filed: September 09, 2024
ECONOX RENEWABLES INC.'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.04 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN SOMERSET COUNTY, MARYLAND.
9752 Date Filed: September 06, 2024
CHABERTON SOLAR BEARTOOTH LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.67 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CARROLL COUNTY, MARYLAND
9748 Date Filed: July 11, 2024
BALTIMORE GAS AND ELECTRIC COMPANY’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE BRANDON SHORES RETIREMENT MITIGATION PROJECT.
9747 Date Filed: July 09, 2024
ELK DEVELOPMENT, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.125 MW SOLAR PHOTOVOLTAIC FACILITY IN CARROLL COUNTY, MARYLAND.
9746 Date Filed: July 08, 2024
ELK DEVELOPMENT, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.142 MW SOLAR PHOTOVOLTAIC FACILITY IN CARROLL COUNTY, MARYLAND.
9743 Date Filed: June 11, 2024
CROOM ROAD SOLAR, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND.
9742 Date Filed: May 22, 2024
TPE MD KE51, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC FACILITY IN KENT COUNTY, MARYLAND.
9740 Date Filed: May 20, 2024
POCOMOKE CITY COMMUNITY ENERGY INITIATIVE LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC FACILITY IN WORCESTER COUNTY, MARYLAND.
9739 Date Filed: May 10, 2024
CHABERTON SOLAR ORCHARD HILL LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.24 MW SOLAR PHOTOVOLTAIC FACILITY IN QUEEN ANNE’S COUNTY, MARYLAND.
9736 Date Filed: April 23, 2024
SPRING VALLEY SOLAR 1, LLC 'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.25 MW SOLAR PHOTOVOLTAIC FACILITY IN CARROLL COUNTY, MARYLAND.
9735 Date Filed: April 22, 2024
CHABERTON SOLAR SUNSHINE LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CARROLL COUNTY, MARYLAND.
9734 Date Filed: April 22, 2024
OAKLAND SOLAR 1, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC FACILITY IN GARRETT COUNTY, MARYLAND.
9733 Date Filed: April 18, 2024
CHABERTON SOLAR RAMIERE LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MEGAWATT SOLAR PHOTOVOLTAIC FACILITY IN MONTGOMERY COUNTY, MARYLAND.
9731 Date Filed: April 08, 2024
DRY RIDGE SOLAR 1, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ALLEGANY COUNTY, MARYLAND
9726 Date Filed: March 05, 2024
CHABERTON SOLAR SUGARLOAF I LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN MONTGOMERY COUNTY, MARYLAND
9725 Date Filed: February 23, 2024
CHABERTON SOLAR PINE ROCK LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0-MEGAWATT SOLAR PHOTOVOLTAIC FACILITY IN CARROLL COUNTY, MARYLAND.
9723 Date Filed: January 31, 2024
CROCKETT SOLAR I, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 61.20 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN TALBOT COUNTY, MARYLAND.
9717 Date Filed: October 13, 2023
CHABERTON SOLAR WILD TURKEY LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND
9716 Date Filed: October 02, 2023
CHABERTON SOLAR BONNVILLE, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY (CPCN) TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN HARFORD COUNTY, MARYLAND
9714 Date Filed: September 28, 2023
CHABERTON SOLAR SNOW, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.0-MEGAWATT SOLAR PHOTOVOLTAIC FACILITY IN WORCESTER COUNTY, MARYLAND
9713 Date Filed: July 19, 2023
BALTIMORE GAS AND ELECTRIC COMPANY'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE FITZELL THIRD AND FOURTH CIRCUITS RECONFIGURATION PROJECT
9710 Date Filed: June 29, 2023
PORTER MILL, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 45.80 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
9698 Date Filed: April 26, 2023
DELMARVA POWER & LIGHT COMPANY'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO REBUILD AN EXISTING 138 KV OVERHEAD TRANSMISSION LINE ON EXISTING RIGHT-OF- WAY FROM THE VIENNA SUBSTATION IN DORCHESTER COUNTY TO THE MARYLAND/DELAWARE STATE LINE
9699 Date Filed: April 26, 2023
POTOMAC ELECTRIC POWER COMPANY'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO REBUILD AN EXISTING DOUBLE CIRCUIT 230 KV OVERHEAD TOWER LINE ON EXISTING RIGHT-OF-WAY FROM THE OAK GROVE SUBSTATION TO THE TALBERT SUBSTATION IN PRINCE GEORGE'S COUNTY
9694 Date Filed: March 15, 2023
KUMQUAT & CITRON CLEANTECH, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 7.20 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
9685 Date Filed: October 28, 2022
COMMUNITY POWER GROUP, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ANNE ARUNDEL COUNTY, MARYLAND
9684 Date Filed: October 26, 2022
ROSEHIP CLEANTECH, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN SOMERSET COUNTY, MARYLAND.
9682 Date Filed: September 22, 2022
TEMO RENEWABLES, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 9.9 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
9677 Date Filed: March 09, 2022
CONSTELLATION POWER SOURCE GENERATION, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO MODIFY THE PERRYMAN GENERATING STATION
9675 Date Filed: January 20, 2022
WAYPOST SOLAR PROJECT, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 92 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CAROLINE COUNTY, MARYLAND
9669 Date Filed: August 03, 2021
POTOMAC EDISON COMPANY'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO REBUILD DOUBS-GOOSE CREEK TRANSMISSION LINE.
9663 Date Filed: April 27, 2021
CPV BACKBONE SOLAR, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 175 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN GARRETT COUNTY,MARYLAND.
9662 Date Filed: April 12, 2021
COSTEN SOLAR, INC'S APPLICATION FOR CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 10.625 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN SOMERSET COUNTY, MARYLAND
9658 Date Filed: January 15, 2021
BALTIMORE GAS AND ELECTRIC COMPANY’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE FIVE FORKS TO WINDY EDGE TRANSMISSION LINE RELIABILITY PROJECT.
9656 Date Filed: December 01, 2020
KUMQUAT & CITRON CLEANTECH, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 7.20 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
9652 Date Filed: September 02, 2020
PTR HOLDCO, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 30 MW SOLAR GENERATING FACILITY IN HARFORD COUNTY, MARYLAND.
9642 Date Filed: April 17, 2020
APPLICATION OF BALTIMORE GAS AND ELECTRIC COMPANY FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE BUSH RIVER CROSSING PROJECT
9636 Date Filed: February 21, 2020
THE APPLICATION OF BALTIMORE GAS AND ELECTRIC COMPANY FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE FIVE FORKS TO MARYLAND/PENNSYLVANIA BORDER TRANSMISSION LINE RELIABILITY PROJECT.
9635 Date Filed: February 14, 2020
THE APPLICATION OF NEW MARKET SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 50 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN DORCHESTER COUNTY, MARYLAND.
9620 Date Filed: August 26, 2019
IN THE MATTER OF THE APPLICATION OF LIGHTSOURCE RENEWABLE ENERGY DEVELOPMENT, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 20 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ST. MARY'S COUNTY, MARYLAND
9608 Date Filed: May 17, 2019
IN THE MATTER OF THE APPLICATION OF SPECTRUM SOLAR, LLC FOR THE CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.6 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND.
9600 Date Filed: December 20, 2018
IN THE MATTER OF THE APPLICATION OF BALTIMORE GAS AND ELECTRIC COMPANY FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE KEY CROSSING RELIABILITY INITIATIVE TRANSMISSION LINE PROJECT.
9499 Date Filed: November 30, 2018
IN THE MATTER OF THE APPLICATION OF MORGNEC ROAD SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 45.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND.
9495 Date Filed: November 13, 2018
IN THE MATTER OF THE APPLICATION OF KIEFFER FUNK, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 11.80 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WASHINGTON COUNTY, MARYLAND.
9496 Date Filed: November 13, 2018
IN THE MATTER OF THE APPLICATION OF BLUEGRASS SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT AN 80 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN QUEEN ANNE'S COUNTY, MARYLAND.
9483 Date Filed: June 08, 2018
IN THE MATTER OF THE APPLICATION OF CITIZENS UB SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 9.9 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN THE TOWN OF UNION BRIDGE AND CARROLL COUNTY, MARYLAND.
9482 Date Filed: May 31, 2018
IN THE MATTER OF THE APPLICATION OF CP CRANE LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY AUTHORIZING THE MODIFICATION OF THE CHARLES P. CRANE GENERATING STATION IN BALTIMORE COUNTY, MARYLAND.
9477 Date Filed: January 23, 2018
IN THE MATTER OF THE APPLICATION OF CHERRYWOOD SOLAR I, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 202 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CAROLINE COUNTY, MARYLAND.
9471 Date Filed: December 27, 2017
IN THE MATTER OF THE APPLICATION OF TRANSOURCE MARYLAND LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT TWO NEW 230 KV TRANSMISSION LINES ASSOCIATED WITH THE INDEPENDENCE ENERGY CONNECTION PROJECT IN PORTIONS OF HARFORD AND WASHINGTON COUNTIES, MARYLAND
9470 Date Filed: December 22, 2017
IN THE MATTER OF THE APPLICATION OF THE POTOMAC EDISON COMPANY FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO MODIFY THE RINGGOLD-CATOCTIN TRANSMISSION LINE N FREDERICK AND WASHINGTON COUNTIES, MARYLAND.
9469 Date Filed: December 21, 2017
IN THE MATTER OF THE APPLICATION OF ENERGY VENTURES IPP, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 10 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND
9465 Date Filed: November 09, 2017
IN THE MATTER OF THE APPLICATION OF TPE MARYLAND SOLAR LAND HOLDINGS, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.425 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND (PRINCE GEORGE'S COUNTY 21).
9466 Date Filed: November 09, 2017
IN THE MATTER OF THE APPLICATION OF TPE MARYLAND SOLAR LAND HOLDINGS, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.25 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND (PRINCE GEORGE'S COUNTY 18).
9464 Date Filed: September 26, 2017
IN THE MATTER OF THE APPLICATION OF MD SOLAR 1, LLC FOR THE CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 32.5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CHARLES COUNTY, MARYLAND
9463 Date Filed: September 25, 2017
IN THE MATTER OF THE APPLICATION OF MD SOLAR 2, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 27.5 MW SOLAR PHOTOVOLTAIC GENERATION FACILITY IN CHARLES COUNTY, MARYLAND.
9457 Date Filed: September 06, 2017
IN THE MATTER OF THE APPLICATION OF RICHFIELD SOLAR ENERGY LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 50 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN DORCHESTER COUNTY, MARYLAND.
9454 Date Filed: June 14, 2017
IN THE MATTER OF THE APPLICATION OF BRICK KILN ROAD SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.4 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND.
9451 Date Filed: May 10, 2017
IN THE MATTER OF THE APPLICATION OF CHESAPEAKE SOLAR LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 9.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND.
9450 Date Filed: April 25, 2017
IN THE MATTER OF THE APPLICATION OF CASPER SOLAR CENTER, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 36.70 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN QUEEN ANNE'S COUNTY, MARYLAND.
9446 Date Filed: April 11, 2017
IN THE MATTER OF THE APPLICATION OF SOL PHOENIX SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND.
9439 Date Filed: February 17, 2017
IN THE MATTER OF THE APPLICATION OF BIGGS FORD SOLAR CENTER, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 15.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND.
9438 Date Filed: December 23, 2016
IN THE MATTER OF THE APPLICATION OF MORGNEC ROAD SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 57.04 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND.
9437 Date Filed: December 22, 2016
IN THE MATTER OF THE APPLICATION OF CPV MARYLAND, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY AUTHORIZING THE MODIFICATION OF ITS ST. CHARLES GENERATING STATION.
9436 Date Filed: December 21, 2016
IN THE MATTER OF THE APPLICATION OF JONES FARM LANE SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 56.70 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN QUEEN ANNE'S COUNTY, MARYLAND.
9434 Date Filed: December 20, 2016
IN THE MATTER OF THE APPLICATION OF EGYPT ROAD SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 45.90 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN THE CITY OF CAMBRIDGE, MARYLAND.
9429 Date Filed: October 07, 2016
IN THE MATTER OF THE APPLICATION OF LEGORE BRIDGE SOLAR CENTER, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 20.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND
9426 Date Filed: September 19, 2016
IN THE MATTER OF THE APPLICATION OF MASON DIXON SOLAR CENTER, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 18.4 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WASHINGTON COUNTY, MARYLAND.